THIRD DEVELOPMENT AXIS – NORTH

Road infrastructure THIRD DEVELOPMENT AXIS – NORTH

The third development axis – north includes the construction of a new four lane road from the Šentrupert access on the A1 motorway (Šentilj–Koper), via Velenje, to the Slovenj Gradec South access. The total length of the expressway is 31.5 km and is divided into two sections.

Section I is 14 km long and runs from the Šentrupert access to the Velenje South access.

The second section, with a length of 17.5 km, runs from the Velenje South junction to the Slovenj Gradec South junction and is divided into sections: Gaberke, Jenina, Škalsko jezero, Konovo, Škale, Velunja, and Podgorje.

On the third development axis North, 8 bridges, 26 viaducts, 5 double-tube and 1 single-tube tunnel, 8 interchanges, 3 galleries, 4 cut-and-covers, 11 overpasses, 15 underpasses, a pedestrian underpass, and the Podgorje rest area on both sides of the expressway will be built.

26 VIADUCTS WILL BE BUILT ON THE 31.5 KM EXPRESSWAY.

Client: Motorway Company in the Republic of Slovenia, DARS d.d.
Status:In progress

TRETJA RAZVOJNA OS – SEVER

TRETJA RAZVOJNA OS – SEVER

Related projects

PEDESTRIAN TRAIL AND CYCLING PATH ALONG THE RATEČE–PLANICA ROAD

Type of project: New construction
Client: Ministry of infrastructure, Slovene Infrastructure Agency

Management system for bridges

Type of project: Bridge management
Client: Motorway Company of the Republic of Slovenia, DARS d.d., and Ministry of Infrastructure, Slovenian Infrastructure Agency

Expressway Koper —Izola

Type of project: New construction
Client: Motorway Company in the Republic of Slovenia, DARS d.d.