FLOOD PROTECTION MEASURES ON THE MURA RIVER IN THE MUNICIPALITIES OF LJUTOMER, AND RAZKRIŽJE

Public utility and water infrastructure FLOOD PROTECTION MEASURES ON THE MURA RIVER IN THE MUNICIPALITIES OF LJUTOMER, AND RAZKRIŽJE

The project includes the extension and raising of the high-water flood protection embankment on the right bank of the Mura River in the municipality of Razkrižje, in the municipality of Ljutomer on the section from Gezove jame to the border with the municipality of Razkrižje.

High-water embankments run along the Mura River, but they no longer meet basic standards; their height is inadequate, and the local materials used in their construction mostly have unsuitable geomechanical properties. In certain sections, the embankments have not yet been built.

 

The construction of flood protection embankments will improve flood safety for residents, agricultural land, and infrastructure along the Mura River.

Type of project:Flood protection measures
Client: Ministry of Natural Resources and Spatial Planning, Slovenian Water Agency
Status:In progress

Related projects

Fishery pier in Koper

Type of project: Reconstruction
Client: City of Koper

VELIKI POTOK FLOODWATER RETENTION BASIN

Type of project: New construction
Client: Ministry of the Environment and Spatial Planning, Slovenian Water Agency

REDUCING FLOOD RISK IN THE DRAVA RIVER BASIN – PTUJ DRAVA AREA

Type of project: Reducing flood risk
Client: Ministry of Natural Resources and Spatial Planning, Slovenian Water Agency