IMPROVEMENT OF FLOOD CONDITIONS IN THE BADAŠEVICA CATCHMENT AREA IN THE CITY OF KOPER – PHASE 1

Public utility and water infrastructure IMPROVEMENT OF FLOOD CONDITIONS IN THE BADAŠEVICA CATCHMENT AREA IN THE CITY OF KOPER – PHASE 1

With rising sea levels and increased peaks of high-water events on watercourses, Koper will in the near future need measures that will significantly reduce the flood risk due to the impact of high waters of the Badaševica River and the sea (along the Badaševica) and backwaters.

Flood safety with a 100-year return period and a design solution that is resistant to future climate change will need to be ensured. This takes into account a sea level rise of 61 cm (lower value) and an increase in flows by 2070.

THE PROJECT WILL INCREASE THE RESILIENCE OF URBAN AREAS TO CLIMATE CHANGE AND ENSURE GREATER SAFETY FOR RESIDENTS.

Type of project:Reducing flood risk
Client: Ministry of Natural Resources and Spatial Planning, Slovenian Water Agency
Status:In progress

IZBOLJŠANJE POPLAVNIH RAZMER NA POVODJU BADAŠEVICE V MESTNI OBČINI KOPER – FAZA 1

IZBOLJŠANJE POPLAVNIH RAZMER NA POVODJU BADAŠEVICE V MESTNI OBČINI KOPER – FAZA 1

Related projects

FLOOD PROTECTION MEASURES ON THE RIGHT BANK OF THE RIVER SAVINJA IN PARIŽLJE

Type of project: Ensuring Flood Safety
Client: Ministry of Natural Resources and Spatial Planning, Slovenian Water Agency

WASTE WATER COLLECTION AND TREATMENT IN THE AREA OF THE LJUBLJANSKO POLJE AQUIFER

Type of project: New construction
Client: City of Ljubljana, Municipality of Medvode and Municipality of Vodice

LJUBLJANA CENTRAL WASTEWATER TREATMENT PLANT

Type of project: Upgrade
Client: City of Ljubljana