SUPERCONTROL OF THE PERFORMED WORKS IN CORRIDOR X IN SERBIA

Road infrastructure SUPERCONTROL OF THE PERFORMED WORKS IN CORRIDOR X IN SERBIA

Within the supercontrol of the works performed in Corridor X, random checks were used to verify whether works are carried out in accordance with the technical specifications and standards set forth in the construction contracts.

Checks were based on visual inspections of the works performed, a laboratory analysis of asphalt and concrete samples collected, and on the basis of reviewing the documentation proving the quality of the work performed.

WORK WAS CARRIED OUT ON CORRIDOR X, ON THE TWO MOTORWAY SECTIONS LEADING TO NORTH MACEDONIA AND BULGARIA.

Type of project:New construction
Client: Koridori Srbije d.o.o.
Status:Completed

Related projects

Motorway section Draženci–Gruškovje border crossing

Type of project: New construction
Client: Motorway Company in the Republic of Slovenia, DARS d.d.

PEDESTRIAN TRAIL AND CYCLING PATH ALONG THE RATEČE–PLANICA ROAD

Type of project: New construction
Client: Ministry of infrastructure, Slovene Infrastructure Agency

Management system for electrical and mechanical equipment in tunnels

Type of project: Pavement management
Client: Motorway Company of the Republic of Slovenia, DARS d.d.