Development of a pavement management system

Road infrastructure Development of a pavement management system

DRI, as part of the project for the development of the pavement management system PMS-DRSI, is developing an expert system that will, based on the data on the condition of the pavements, traffic load, road decay models and the prices of the reconstruction measures, enable optimal preparation of the plan for reconstructions and simulation of the future condition of the network, depending on the available/envisaged means for their maintenance.

The roads with the least traffic load are specifically the regional roads of the third class and so-called tourist roads, where on average we record from five to several hundred vehicles per day.

The pavement management system will enable the optimal preparation of plans for the reconstruction of the 6,000 km long national road network.

Type of project:Pavement management
Client: Ministry of Infrastructure, Slovenian Infrastructure Agency
Status:In progress

Related projects

Bridge over the Sava River

Type of project: New construction
Client: City of Belgrade and Belgrade Land Development Public Agency

Tube 2 of the Karavanke motorway tunnel

Type of project: New construction
Client: Motorway Company in the Republic of Slovenia, DARS d.d.

Super control of the works performed in Corridor X

Type of project: New construction
Client: Koridori Srbije d.o.o.