Sarajevo Bypass - Lot 1

Road infrastructure Sarajevo Bypass - Lot 1

The Sarajevo bypass is one of the most comprehensive motorway projects on the Vc Corridor, running through Bosnia and Herzegovina from Budapest to the Adriatic Sea.

The bypass is divided into three sections in the total length of 16.5 km, with Lot 1 representing the first section. Three viaducts, two bridges, two tunnels and one junction were constructed as well as a 5.7 km long motorway route, connecting villages Jošanica and Butila. The Butila junction - the most impressive structure on the route - is designed as a three-grade separated crossing of four ramps and two structures, bridging the Bosna River and urban roads.

Type of project:New construction
Client: Javno preduzeće Ceste Federacije BiH, d.o.o.
Status:Completed

Related projects

North bypass road Bled

Type of project: New construction
Client: Ministry of Infrastructure, Slovenian Infrastructure Agency

Reconstruction of national road pavements

Type of project: Reconstruction
Client: The Ministry of Infrastructure, Slovenian Infrastructure Agency

Škofja Loka bypass

Type of project: New construction
Client: The Ministry of Infrastructure, Slovenian Infrastructure Agency